Yesterday some of the group were back in Nether Compton investigating a curious flat surface in a gentleman's back garden. It gave us the chance to practice using our Resistivity meter and survey the site. We put the training by the team at Geoflo to good use. We set out a 10 meter grid on a north/south alignment and got to work.
Hopefully we can get some useful data from the site, I will post our results soon!
Subscribe to:
Post Comments (Atom)
Strap In For The Ride
The B1 trench, that we opened because we can't work on the main 10m square trench at the moment, has yielded lots of pottery from a very...

-
Yesterday some of the group were back in Nether Compton investigating a curious flat surface in a gentleman's back garden. It gave us th...
-
Two worked stones that could be the top corners of a doorway. The drain turns at a right angle and heads south. Capping stones ...
-
Martin (left) and WDDAG WDDAG visited Martin Green's Down Farm this weekend, and what an experience it was! He took us through ...
No comments:
Post a Comment