The floor trench is now being worked on to try and find out what is cutting what. It seems that the modern intrusion does not touch the robbed out wall trench, seen here in the baulk section (red). More fill may need to come out of this latter feature. We are still awaiting the machine to come free so as to extend this trench to the east.
Sunday, 15 September 2019
Subscribe to:
Post Comments (Atom)
Dig 2026
The 2026 season will begin on 1st March, with the topsoil stripping. 8th March will be the first excavation day. Lets hope that this continu...
-
Martin (left) and WDDAG WDDAG visited Martin Green's Down Farm this weekend, and what an experience it was! He took us through ...
-
Two worked stones that could be the top corners of a doorway. The drain turns at a right angle and heads south. Capping stones ...
-
Yesterday some of the group were back in Nether Compton investigating a curious flat surface in a gentleman's back garden. It gave us th...

No comments:
Post a Comment