Thursday, 23 August 2018

Feeling drained...


Nice piece of roof tile came up today. Green glazed.



We now have a new drain. The original one ran E-W, then N-S and now into another drain heading E-W continuing under the baulk. This is a massive structure for this mansion house and must have taken a large work force and a long time to build. A big addition to the history of Stalbridge House. 

No comments:

Post a Comment

The 5m square test trench has proved very fruitful. Ditch features and Early Medieval dating evidence has been produced and the evidence sug...